Serving eleven lakes since 1998 Spring install schedule now booking
Blue Harbor Dock & Lift Docks · Lifts · Shoreline Free quote

Your dock in the water by opening weekend.

Blue Harbor builds, installs, services and stores docks and boat lifts across the county. Twenty-seven seasons on these lakes, and we know which bottoms hold a post and which do not.

  • Licensed & insured
  • Permits filed for you
  • 48-hour service calls
  • Winter storage on site
120 ft piling dock · Lake Verona

Services

Aluminium and cedar docks, cantilever and vertical lifts, shoreline protection, and the seasonal work that keeps all of it running.

New dock construction

Sectional, roll-in and piling docks sized to your frontage, decked in cedar, composite or aluminium.

Boat & PWC lifts

1,200 to 10,000 lb capacity, with canopies, remote drives and solar charging installed and set up.

Shoreline & seawalls

Riprap, steel and vinyl seawalls, erosion repair and beach restoration, permitted with the lake authority.

Seasonal install & removal

On a scheduled route each spring and fall, so your dock is in before the season and out before the ice.

Service & repair

Cables, pulleys, motors, bunks and decking replaced; storm-damaged sections straightened and re-set.

Winter storage

Cold and heated storage for lifts, canopies and dock sections, with pickup and spring return included.

Gallery

Sectional dock · Cedar Lake
4,500 lb vertical lift · Birch Bay
Vinyl seawall · 90 ft frontage
Roll-in dock & PWC port

The season, scheduled

Join the route once and the calendar is ours to manage. You get a text the week before every visit and photos when the work is done.

Join the spring route
Month What happens
AprilDock sections set, lift positioned and levelled, hardware inspected.
JuneMid-season check: cables greased, bunks adjusted, bolts retorqued.
AugustService window for repairs and upgrades before the busy end of summer.
OctoberEverything pulled before ice-up and stacked above the waterline.
WinterStorage at our yard, with repairs done off-season at a lower rate.

“Lift motor died on a Friday in July. Running again Saturday morning, no weekend surcharge.”

J. Farrow · Cedar Lake

“Third season on the route and I have not thought about the dock once. Exactly what I wanted.”

M. Sandoval · Birch Bay

“They filed the shoreline permit I had been putting off for two years, and it cleared in a month.”

R. Tanaka · Lake Verona

Request a free quote

Give us the lake, the frontage and what you are trying to do. Most quotes come from photos and a phone call.

Yard
14 Marina Way · Mon–Sat 7–5 in season
Lakes
Cedar, Verona, Birch Bay and eight more

Request received

We will call within a business day to talk through depth and layout. In season, repair calls get a response the same afternoon.

Call (555) 015-7700